Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Production scheduling in a foundry machine shop

Bibliography: pages 89-92.

Saved in:
Bibliographic Details
Main Author: Miller, Jeremy John
Other Authors: Lister, Gordon
Format: Thesis
Language:English
Published: Department of Mechanical Engineering 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613146268565504
access_status_str Open Access
author Miller, Jeremy John
author2 Lister, Gordon
author_browse Lister, Gordon
Miller, Jeremy John
author_facet Lister, Gordon
Miller, Jeremy John
author_sort Miller, Jeremy John
collection Thesis
description Bibliography: pages 89-92.
format Thesis
id oai:open.uct.ac.za:11427/21924
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:31:30.019Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2016
publishDateRange 2016
publishDateSort 2016
publisher Department of Mechanical Engineering
publisherStr Department of Mechanical Engineering
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/21924 Production scheduling in a foundry machine shop Miller, Jeremy John Lister, Gordon Engineering Management Bibliography: pages 89-92. The scheduling of production in job shops is generally accomplished in four stages; aggregate planning, machine loading, sequencing and detailed scheduling. In industrial job shops, the number of jobs and machines makes detailed scheduling a particularly complicated and unwieldy task. When faced with this situation, a typical response of managements is to simply ignore the problem and apply some remedial action by adapting existing company operation procedures. The first objective of this dissertation is to indicate the dangers and inefficiencies which result when the problem of detailed scheduling is ignored. This is done in terms of a case study analysis in which the problems which currently exist in the machine shop at Atlantis Aluminium, a jobbing foundry, are illustrated. The second objective is to develop a systematic approach for the solution of detailed scheduling in job shops. Major steps in this approach are: i) a classification of shop scheduling problems ii) a survey of relevant scheduling literature in order to determine existing detailed scheduling techniques iii) the design of the scheduling system This approach is illustrated by applying it to the machine shop at Atlantis Aluminium. 2016-09-25T16:49:59Z 2016-09-25T16:49:59Z 1986 Master Thesis Masters MSc (Eng) http://hdl.handle.net/11427/21924 eng application/pdf Department of Mechanical Engineering Faculty of Engineering and the Built Environment University of Cape Town
spellingShingle Engineering Management
Miller, Jeremy John
Production scheduling in a foundry machine shop
thesis_degree_str Master's
title Production scheduling in a foundry machine shop
title_full Production scheduling in a foundry machine shop
title_fullStr Production scheduling in a foundry machine shop
title_full_unstemmed Production scheduling in a foundry machine shop
title_short Production scheduling in a foundry machine shop
title_sort production scheduling in a foundry machine shop
topic Engineering Management
url http://hdl.handle.net/11427/21924
work_keys_str_mv AT millerjeremyjohn productionschedulinginafoundrymachineshop