Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

The design of a data model (DM) for managing durability index (DI) results for national road infrastructure

As part of a R 1.14 Billion 64-month concrete construction mega-project which began in May 2013, the Mt Edgecombe Interchange, comprising two incrementally launched bridges, the longest at 948 metres long and the other at 440 metres which joins uMhlanga and the N2 North, necessitates the demand to h...

Full description

Saved in:
Bibliographic Details
Main Author: Govender, Daniel
Other Authors: Alexander, Mark
Format: Thesis
Language:Eng
Published: Department of Civil Engineering 2020
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!