Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
As part of a R 1.14 Billion 64-month concrete construction mega-project which began in May 2013, the Mt Edgecombe Interchange, comprising two incrementally launched bridges, the longest at 948 metres long and the other at 440 metres which joins uMhlanga and the N2 North, necessitates the demand to h...
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | Eng |
| Published: |
Department of Civil Engineering
2020
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|