Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Validation of the deck behaviour due to post-tension loading of Ashton arch bridge

The new Ashton Bridge is a concrete tied-arch structure with a cable-supported deck, which spans 110 metres below the arching ribs. The tie-beam members, connecting the arch ribs, each have six longitudinal tendons that have primarily straight profiles. The author set out to validate the structural...

Full description

Saved in:
Bibliographic Details
Main Author: Van Wijk, Heinrich
Other Authors: Moyo, Pilate
Format: Thesis
Language:English
Published: Department of Civil Engineering 2020
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!