Development of a Dynamic Simulation Model for Equalization Tanks

The influent to a water and resource recovery facility (WRRF) generally exhibits significant diurnal variations in flow rate and load concentration. This makes determining the operating parameters and subsequently the overall operation of plants difficult, especially in developing countries due to t...

Full description

Saved in:
Bibliographic Details
Main Author: Fotso, Simo Eugene
Other Authors: Ikumi, David
Format: Thesis
Language:English
Published: Department of Civil Engineering 2021
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613183805489152
access_status_str Open Access
author Fotso, Simo Eugene
author2 Ikumi, David
author_browse Fotso, Simo Eugene
Ikumi, David
author_facet Ikumi, David
Fotso, Simo Eugene
author_sort Fotso, Simo Eugene
collection Thesis
description The influent to a water and resource recovery facility (WRRF) generally exhibits significant diurnal variations in flow rate and load concentration. This makes determining the operating parameters and subsequently the overall operation of plants difficult, especially in developing countries due to the lack of highly skilled operators. Hence, there is an incentive for the control and operation of WRRFs in developing countries to be improved. Flow equalization tanks were identified as a potential method to attenuate the diurnal variations in flow rate and load concentration into plants. The main aim of this research was to develop a viable dynamic simulation model for the operation of flow equalization tanks, within a plant-wide framework (to allow for the evaluation of design and control strategies). The next aim was to determine the benefits of equalization tanks towards design and optimised operation of future WRRFs via scenario analyses. Finally, the effects of the equalization tank on the performance of various unit processes in a WRRF were to be investigated. The model was developed in three steps; i) the development of the required equations to model equalization tanks, ii) mass balance throughout the model for internal consistency and iii) scenario analyses to determine if the model generated reasonable and scientifically sound outputs. The model was developed using Microsoft Excel Visual Basic (VBA) and WEST®. Two scenarios were considered to assess the equalization tank modelled. Scenario One involved the comparison of the capital cost, unit process sizes and total footprint of a balanced sludge age Modified Ludzack-Ettinger (MLE) system with and without an equalization tank. Scenario Two compared the plant performance of the MLE system designed in Scenario One with and without a flow equalization tank. A dynamic simulation model replicating equalization tanks was successfully developed. From scenario analyses, it was determined that using an MLE system and only considering equalization of flow, there was a reduction in the size of several unit processes by 8-9% (primary settling tank, biological reactors, secondary settling tank, flotation unit, anoxic-aerobic digester), due to the less conservative design values that could be used as the variations of the influent were decreased. Despite this, a 13% overall increase in the footprint of the WRRF was observed due to the addition of the equalization tank. The attenuation of diurnal flow variations also resulted in reduction of various plant parameters by up to 50% (flow, OUR, VSS flux). Finally, there was a 10% improvement in the performance of various unit processes due to the presence of the equalization tank. In conclusion, the inclusion of equalization tanks in WRRFs has significant positive effects. These results were obtained with equalization of flow only. Some other limitations were experienced during the project resulting in the following recommendations: further research will be needed to validate and calibrate the model, As the model was not successfully incorporated in a plant-wide framework, further developments in that direction are required, as well as including the equalization of load in the model.
format Thesis
id oai:open.uct.ac.za:11427/33714
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:32:06.010Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2021
publishDateRange 2021
publishDateSort 2021
publisher Department of Civil Engineering
publisherStr Department of Civil Engineering
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/33714 Development of a Dynamic Simulation Model for Equalization Tanks Fotso, Simo Eugene Ikumi, David Ekama, George equalization tank water resource and recovery facility Modified Ludzack-Ettinger system dynamic model The influent to a water and resource recovery facility (WRRF) generally exhibits significant diurnal variations in flow rate and load concentration. This makes determining the operating parameters and subsequently the overall operation of plants difficult, especially in developing countries due to the lack of highly skilled operators. Hence, there is an incentive for the control and operation of WRRFs in developing countries to be improved. Flow equalization tanks were identified as a potential method to attenuate the diurnal variations in flow rate and load concentration into plants. The main aim of this research was to develop a viable dynamic simulation model for the operation of flow equalization tanks, within a plant-wide framework (to allow for the evaluation of design and control strategies). The next aim was to determine the benefits of equalization tanks towards design and optimised operation of future WRRFs via scenario analyses. Finally, the effects of the equalization tank on the performance of various unit processes in a WRRF were to be investigated. The model was developed in three steps; i) the development of the required equations to model equalization tanks, ii) mass balance throughout the model for internal consistency and iii) scenario analyses to determine if the model generated reasonable and scientifically sound outputs. The model was developed using Microsoft Excel Visual Basic (VBA) and WEST®. Two scenarios were considered to assess the equalization tank modelled. Scenario One involved the comparison of the capital cost, unit process sizes and total footprint of a balanced sludge age Modified Ludzack-Ettinger (MLE) system with and without an equalization tank. Scenario Two compared the plant performance of the MLE system designed in Scenario One with and without a flow equalization tank. A dynamic simulation model replicating equalization tanks was successfully developed. From scenario analyses, it was determined that using an MLE system and only considering equalization of flow, there was a reduction in the size of several unit processes by 8-9% (primary settling tank, biological reactors, secondary settling tank, flotation unit, anoxic-aerobic digester), due to the less conservative design values that could be used as the variations of the influent were decreased. Despite this, a 13% overall increase in the footprint of the WRRF was observed due to the addition of the equalization tank. The attenuation of diurnal flow variations also resulted in reduction of various plant parameters by up to 50% (flow, OUR, VSS flux). Finally, there was a 10% improvement in the performance of various unit processes due to the presence of the equalization tank. In conclusion, the inclusion of equalization tanks in WRRFs has significant positive effects. These results were obtained with equalization of flow only. Some other limitations were experienced during the project resulting in the following recommendations: further research will be needed to validate and calibrate the model, As the model was not successfully incorporated in a plant-wide framework, further developments in that direction are required, as well as including the equalization of load in the model. 2021-08-06T08:50:47Z 2021-08-06T08:50:47Z 2021 2021-08-06T08:25:31Z Master Thesis Masters MSc http://hdl.handle.net/11427/33714 eng application/pdf Department of Civil Engineering Faculty of Engineering and the Built Environment
spellingShingle equalization tank
water resource and recovery facility
Modified Ludzack-Ettinger system
dynamic model
Fotso, Simo Eugene
Development of a Dynamic Simulation Model for Equalization Tanks
thesis_degree_str Master's
title Development of a Dynamic Simulation Model for Equalization Tanks
title_full Development of a Dynamic Simulation Model for Equalization Tanks
title_fullStr Development of a Dynamic Simulation Model for Equalization Tanks
title_full_unstemmed Development of a Dynamic Simulation Model for Equalization Tanks
title_short Development of a Dynamic Simulation Model for Equalization Tanks
title_sort development of a dynamic simulation model for equalization tanks
topic equalization tank
water resource and recovery facility
Modified Ludzack-Ettinger system
dynamic model
url http://hdl.handle.net/11427/33714
work_keys_str_mv AT fotsosimoeugene developmentofadynamicsimulationmodelforequalizationtanks