Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay

Nelson Mandela Bay Municipality (NMBM) made the decision in 2008 to exempt industrial areas from load-shedding to avoid job losses. However, during 2019, when South Africa was experiencing prevalent periods of load-shedding, residents, and small business owners in other areas, protested this. On the...

Full description

Saved in:
Bibliographic Details
Main Author: Bailey, Anelle
Other Authors: Michell, Kathleen
Format: Thesis
Language:English
Published: Department of Construction Economics and Management 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1867613301192523776
access_status_str Open Access
author Bailey, Anelle
author2 Michell, Kathleen
author_browse Bailey, Anelle
Michell, Kathleen
author_facet Michell, Kathleen
Bailey, Anelle
author_sort Bailey, Anelle
collection Thesis
description Nelson Mandela Bay Municipality (NMBM) made the decision in 2008 to exempt industrial areas from load-shedding to avoid job losses. However, during 2019, when South Africa was experiencing prevalent periods of load-shedding, residents, and small business owners in other areas, protested this. On the 9th of December 2019, Eskom announced on Twitter, and implemented Stage 6 loadshedding for the first time (Eskom, 2019), and subsequently on the 11th of December 2019, NMBM posted new load-shedding schedules for Stages 5 to 8, which included the previously excluded industrial areas, including Perseverance, a suburb of Gqeberha (Port Elizabeth) in the district of Nelson Mandela Bay (NMB) with uninterrupted and preferential electricity supply since 2000. As Industries in Perseverance have not been subjected to load-shedding since load-shedding commenced, the enterprises in Perseverance have not been incentivized to make allowance and/or budget for, any interruption to their industrial activities. The nature of many of the industries that subsequently invested in Perseverance, were industries, that are dependent on uninterrupted electricity, to manufacture their products cost effectively, and without harm to their employees or the environment. This research aimed to investigate the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings, with a case study focused on Perseverance. An overarching qualitative case study with an embedded convergent parallel mixed method design, consisting of 20 quantitative survey questionnaires from participants in Perseverance and 11 qualitative semi-structured interviews with facility managers, plant engineers and/or managing directors of enterprises in Perseverance. A further 14 quantitative survey questionnaires were received from enterprises in the remainder of NMB. The findings revealed the shock and concern from facility managers to the threat of potential electrical load-shedding and revealed the operational and strategic decisions that was considered, since December 2019 as well as their way forward to manage the threat of electrical load-shedding in Perseverance. It was also revealed that sustained transparent communication needs to be initiated between industrialists and NMBM.
format Thesis
id oai:open.uct.ac.za:11427/37421
institution University of Cape Town (South Africa)
language eng
last_indexed 2026-06-10T12:33:57.504Z
license_str Not specified — see source repository
provenance_str_mv Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository
publishDate 2023
publishDateRange 2023
publishDateSort 2023
publisher Department of Construction Economics and Management
publisherStr Department of Construction Economics and Management
record_format dspace
source_str UCTD — University of Cape Town Open Access Repository
spelling oai:open.uct.ac.za:11427/37421 An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay Bailey, Anelle Michell, Kathleen Property Studies Nelson Mandela Bay Municipality (NMBM) made the decision in 2008 to exempt industrial areas from load-shedding to avoid job losses. However, during 2019, when South Africa was experiencing prevalent periods of load-shedding, residents, and small business owners in other areas, protested this. On the 9th of December 2019, Eskom announced on Twitter, and implemented Stage 6 loadshedding for the first time (Eskom, 2019), and subsequently on the 11th of December 2019, NMBM posted new load-shedding schedules for Stages 5 to 8, which included the previously excluded industrial areas, including Perseverance, a suburb of Gqeberha (Port Elizabeth) in the district of Nelson Mandela Bay (NMB) with uninterrupted and preferential electricity supply since 2000. As Industries in Perseverance have not been subjected to load-shedding since load-shedding commenced, the enterprises in Perseverance have not been incentivized to make allowance and/or budget for, any interruption to their industrial activities. The nature of many of the industries that subsequently invested in Perseverance, were industries, that are dependent on uninterrupted electricity, to manufacture their products cost effectively, and without harm to their employees or the environment. This research aimed to investigate the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings, with a case study focused on Perseverance. An overarching qualitative case study with an embedded convergent parallel mixed method design, consisting of 20 quantitative survey questionnaires from participants in Perseverance and 11 qualitative semi-structured interviews with facility managers, plant engineers and/or managing directors of enterprises in Perseverance. A further 14 quantitative survey questionnaires were received from enterprises in the remainder of NMB. The findings revealed the shock and concern from facility managers to the threat of potential electrical load-shedding and revealed the operational and strategic decisions that was considered, since December 2019 as well as their way forward to manage the threat of electrical load-shedding in Perseverance. It was also revealed that sustained transparent communication needs to be initiated between industrialists and NMBM. 2023-03-13T14:03:57Z 2023-03-13T14:03:57Z 2022 2023-02-20T12:14:48Z Master Thesis Masters MSc http://hdl.handle.net/11427/37421 eng application/pdf Department of Construction Economics and Management Faculty of Engineering and the Built Environment
spellingShingle Property Studies
Bailey, Anelle
An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
thesis_degree_str Master's
title An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
title_full An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
title_fullStr An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
title_full_unstemmed An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
title_short An investigation of the effects of potential electrical load-shedding on facility manager's strategic and operational decisions in industrial buildings: A case study of Perseverance Industrial Township, Nelson Mandela Bay
title_sort investigation of the effects of potential electrical load shedding on facility manager s strategic and operational decisions in industrial buildings a case study of perseverance industrial township nelson mandela bay
topic Property Studies
url http://hdl.handle.net/11427/37421
work_keys_str_mv AT baileyanelle aninvestigationoftheeffectsofpotentialelectricalloadsheddingonfacilitymanagersstrategicandoperationaldecisionsinindustrialbuildingsacasestudyofperseveranceindustrialtownshipnelsonmandelabay
AT baileyanelle investigationoftheeffectsofpotentialelectricalloadsheddingonfacilitymanagersstrategicandoperationaldecisionsinindustrialbuildingsacasestudyofperseveranceindustrialtownshipnelsonmandelabay