Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Includes bibliographical references (leaves 79-83).
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Mechanical Engineering
2014
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613300616855552 |
|---|---|
| access_status_str | Open Access |
| author | Kabia, John Amara |
| author_browse | Kabia, John Amara |
| author_facet | Kabia, John Amara |
| author_sort | Kabia, John Amara |
| collection | Thesis |
| description | Includes bibliographical references (leaves 79-83). |
| format | Thesis |
| id | oai:open.uct.ac.za:11427/5526 |
| institution | University of Cape Town (South Africa) |
| language | eng |
| last_indexed | 2026-06-10T12:33:57.504Z |
| license_str | Not specified — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository |
| publishDate | 2014 |
| publishDateRange | 2014 |
| publishDateSort | 2014 |
| publisher | Department of Mechanical Engineering |
| publisherStr | Department of Mechanical Engineering |
| record_format | dspace |
| source_str | UCTD — University of Cape Town Open Access Repository |
| spelling | oai:open.uct.ac.za:11427/5526 Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station Kabia, John Amara Mechanical Engineering Includes bibliographical references (leaves 79-83). 2014-07-31T11:21:32Z 2014-07-31T11:21:32Z 2005 Master Thesis Masters MSc http://hdl.handle.net/11427/5526 eng application/pdf Department of Mechanical Engineering Faculty of Engineering and the Built Environment University of Cape Town |
| spellingShingle | Mechanical Engineering Kabia, John Amara Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| thesis_degree_str | Master's |
| title | Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| title_full | Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| title_fullStr | Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| title_full_unstemmed | Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| title_short | Availability assessment of mixed hydro and diesel power supply system : a case study : Sierra Leone's Bumbuna hydroelectric project and Kingtom Power Station |
| title_sort | availability assessment of mixed hydro and diesel power supply system a case study sierra leone s bumbuna hydroelectric project and kingtom power station |
| topic | Mechanical Engineering |
| url | http://hdl.handle.net/11427/5526 |
| work_keys_str_mv | AT kabiajohnamara availabilityassessmentofmixedhydroanddieselpowersupplysystemacasestudysierraleonesbumbunahydroelectricprojectandkingtompowerstation |