Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
Bibliography: leaf 69.
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Thesis |
| Language: | English |
| Published: |
Department of Mechanical Engineering
2014
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1867613222620626944 |
|---|---|
| access_status_str | Open Access |
| author | Fakira, B S J Hamida |
| author2 | Lister, Gordon |
| author_browse | Fakira, B S J Hamida Lister, Gordon |
| author_facet | Lister, Gordon Fakira, B S J Hamida |
| author_sort | Fakira, B S J Hamida |
| collection | Thesis |
| description | Bibliography: leaf 69. |
| format | Thesis |
| id | oai:open.uct.ac.za:11427/8384 |
| institution | University of Cape Town (South Africa) |
| language | eng |
| last_indexed | 2026-06-10T12:32:42.829Z |
| license_str | Not specified — see source repository |
| provenance_str_mv | Harvested via OAI-PMH from UCTD — University of Cape Town Open Access Repository |
| publishDate | 2014 |
| publishDateRange | 2014 |
| publishDateSort | 2014 |
| publisher | Department of Mechanical Engineering |
| publisherStr | Department of Mechanical Engineering |
| record_format | dspace |
| source_str | UCTD — University of Cape Town Open Access Repository |
| spelling | oai:open.uct.ac.za:11427/8384 The influence of project structural factors on the time management of electronic engineering projects in the south western Cape Fakira, B S J Hamida Lister, Gordon Engineering Management Bibliography: leaf 69. Time management is certainly the most invaluable tool in projecting time-phased resource utilisation requirements as well as providing a basis for tracking performance. It allows optimal integration of all the resources in a project such that synergy is produced. Consequently, an effective time management system is crucial to the success of a project. This research highlights the major requirements for setting up an effective time management system for electronic engineering companies in the South Western Cape. It includes a literature review which shows the influence of the project structural factors on time management and the project performance. The research also uses an industrial survey to uncover the current impact of the project structural factors on electronic engineering projects. The effectiveness of alternative time control system is examined as well. From the findings of this research study, it has been possible to set up guidelines for selecting time control techniques which are pertinent to the current project structural factors of electronic engineering projects. 2014-10-11T12:16:27Z 2014-10-11T12:16:27Z 1993 Master Thesis Masters MSc http://hdl.handle.net/11427/8384 eng application/pdf Department of Mechanical Engineering Faculty of Engineering and the Built Environment University of Cape Town |
| spellingShingle | Engineering Management Fakira, B S J Hamida The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| thesis_degree_str | Master's |
| title | The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| title_full | The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| title_fullStr | The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| title_full_unstemmed | The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| title_short | The influence of project structural factors on the time management of electronic engineering projects in the south western Cape |
| title_sort | influence of project structural factors on the time management of electronic engineering projects in the south western cape |
| topic | Engineering Management |
| url | http://hdl.handle.net/11427/8384 |
| work_keys_str_mv | AT fakirabsjhamida theinfluenceofprojectstructuralfactorsonthetimemanagementofelectronicengineeringprojectsinthesouthwesterncape AT fakirabsjhamida influenceofprojectstructuralfactorsonthetimemanagementofelectronicengineeringprojectsinthesouthwesterncape |