Full Text Available

Note: Clicking the button above will open the full text document at the original institutional repository in a new window.

Optimum time to refurbish a boiler feed pump at Eskom's power stations

A key focus area in power generation today is to improve equipment and plant efficiency, with this study specifically aimed to determine the optimum time to refurbish a boiler feed pump by analysing the internal wear of the annular seals. The boiler feed pump (BFP) installed in a power station is ei...

Full description

Saved in:
Bibliographic Details
Main Author: Mortlock, Steven Peter
Other Authors: Vicatos, George
Format: Thesis
Language:English
Published: Department of Mechanical Engineering 2014
Tags: Add Tag
No Tags, Be the first to tag this record!