Full Text Available
Note: Clicking the button above will open the full text document at the original institutional repository in a new window.
| Published in: | AURUM : M�hendislik Sistemleri ve Mimarl?k Dergisi = Aurum Journal of Engineering Systems and Architecture |
|---|---|
| Format: | Online Article RSS Article |
| Published: |
2025
|
| Subjects: | |
| Tags: |
No Tags, Be the first to tag this record!
|
| _version_ | 1868553695116918784 |
|---|---|
| collection | WordPress RSS FRELIP Feed Integration |
| container_title | AURUM : M�hendislik Sistemleri ve Mimarl?k Dergisi = Aurum Journal of Engineering Systems and Architecture |
| description | |
| discipline_display | Architecture |
| discipline_facet | Architecture |
| format | Online Article RSS Article |
| genre | Journal Article |
| id | rss_article:83708 |
| institution | FRELIP |
| journal_source_facet | AURUM : M�hendislik Sistemleri ve Mimarl?k Dergisi = Aurum Journal of Engineering Systems and Architecture |
| last_indexed | 2026-06-20T21:41:07.455Z |
| publishDate | 2025 |
| publishDateSort | 2025 |
| record_format | rss_article |
| spellingShingle | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies Architecture General Architecture |
| sub_discipline_display | General |
| sub_discipline_facet | General |
| subject_display | Architecture General Architecture |
| subject_facet | Architecture General Architecture |
| title | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_alt | Retrasos por cambios de diseño en la industria de la construcción de Omán: Desafíos y estrategias de mitigación Retards de modification de conception dans l'industrie de la construction d'Oman : Défis et stratégies d'atténuation Atrasos por Mudanças de Projeto na Indústria da Construção de Omã: Desafios e Estratégias de Mitigação |
| title_auth | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_es_txt | Retrasos por cambios de diseño en la industria de la construcción de Omán: Desafíos y estrategias de mitigación |
| title_fr_txt | Retards de modification de conception dans l'industrie de la construction d'Oman : Défis et stratégies d'atténuation |
| title_full | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_fullStr | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_full_unstemmed | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_pt_txt | Atrasos por Mudanças de Projeto na Indústria da Construção de Omã: Desafios e Estratégias de Mitigação |
| title_short | Design Change Delays in Oman’s Construction Industry: Challenges and Mitigation Strategies |
| title_sort | design change delays in oman’s construction industry: challenges and mitigation strategies |
| topic | Architecture General Architecture |
| url | https://dergipark.org.tr/en/pub/ajesa/article/1795838%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20 |